Home > Oversized, heavy loads, handling and warehousing > Transport and stuffing of a tool machine in the context of factory dismantling.

Transport and stuffing of a tool machine in the context of factory dismantling.

As part of a dismantling of a factory at Le Creusot, our freight forwarder asked us to transport a disassembled machine tool intended for export to India.

 

A total of 500 m3 and 300 tons were transported from the factory to the warehouse in Fos sur Mer via about 20 semi-trailers.

 

Once the freight was received and stored, we carried out stowing, stuffing, weighing of the CTs to define their VGM (Verified Gross Mass) under the Solas agreement, and the 10x40'FLAT docking , 3x40'OT and 3x40'HC.

 

A hearty thanks to our client for his confidence in this issue and to all the actors who allowed the efficient running of this operation

Need
informations ?
Fields marked by asterisks (*) are required